020 8500 2500 Monday to Friday, 8:30 to 17:00 Drawings and tender packs: drawings@prolinesales.co.uk
PROLINEArchitectural Ironmongers

Buildings we supplied

Five jobs, photographed by us on site during and after installation. These are record shots, not styled photography, and we have not pretended otherwise.

SectorsEducation, office, apartments, hotelPhotographsOurs, taken on siteOn recordCharlotte Road, Shoreditch, February 2017
The brick elevation of a college accommodation building with a lawn in front
Student accommodation, Cambridge Student accommodation, scheduled and supplied over two phases Education

Education

Student accommodation, two phases
A study bedroom with a timber doorset, fitted wardrobe and a corridor beyond
Corridor doorsetsClosers, vision panels, lever furniture
A study bedroom with a bed, desk and a timber door to the corridor
Study bedroomsPrivacy sets and closers
A study bedroom with a desk, chair and fitted storage beside a timber door
Study bedrooms, phase twoSame specification, held
A communal kitchen and dining area with timber doors and a glazed screen
Common roomFire doors and glazed screens
A fitted kitchen with wall units, a green tiled splashback and a door to the corridor
Shared kitchenDoor and cabinet hardware

Commercial office

Atrium to stair core
A multi storey office atrium with balustrading, glazed screens and internal doors
Atrium and circulationBalustrade fittings, glass door gear
An office reception area with seating, a counter and glazed doors beyond
ReceptionAccess control, closers, pull handles
An open office floor with a feature stair, exposed services and glazed partitions
Stair coreFire doors, panic hardware

Apartments

Entrance doorsets to bathroom fittings
An apartment living room with a timber floor, dining table and glazed doors to a balcony
Living areasEntrance doorsets and internal ironmongery
A residential courtyard seen from above, with brick elevations, walkways and planting
Communal accessAccess control and entrance hardware
An apartment bathroom with a walk in shower, basin and hexagonal floor tiling
BathroomsPrivacy sets, grab rails, mirrors

Hospitality and private residential

Corridors and hallways
A corridor of timber doorsets with vision panels and lever furniture
Bedroom corridorDoorsets, closers, access control
A residential hallway with a sideboard and a panelled door with a dark lever handle
Private hallwayLever furniture and hinges

Site record photographs, taken by us during and after installation. Not styled photography, and we have not pretended otherwise.

One narrow one way street, five storeys up, two occupied buildings.

Charlotte Road, Shoreditch, February 2017. Six apartments formed by demolishing the fourth floor of two occupied buildings and building two new floors above. The ironmongery went to site in phases rather than in a lorry, because a lorry was never going to be the answer. Clements and Porter Architects, private client.

Makers on these jobs

One schedule, four or five of them
  • ASSA ABLOY
  • Carlisle Brass
  • Croft
  • dormakaba
  • Eclisse
  • Eurolite
  • Eurospec
  • Finfort
  • GEZE
  • Häfele
  • Heritage Brass
  • HOPPE
  • Paxton
  • Yale

We will show you the schedule behind any door on this page.

Numbered floor plans and a door schedule are enough to begin. We will tell you what is missing before we start, not halfway through.

Monday to Friday, 8:30 to 17:00. Or forward the whole email thread to drawings@prolinesales.co.uk.

Call Send drawings